Skip to main content
DTE logo

DTE Energy Company

Exchange: NYSESector: UtilitiesIndustry: Utilities - Regulated Electric

DTE Energy is a Detroit-based diversified energy company involved in the development and management of energy-related businesses and services nationwide. Its operating units include an electric company serving 2.3 million customers in Southeast Michigan and a natural gas company serving 1.4 million customers across Michigan. The DTE portfolio also includes energy businesses focused on custom energy solutions, renewable energy generation, and energy marketing and trading. DTE has continued to accelerate its carbon reduction goals to meet aggressive targets and is committed to serving with its energy through volunteerism, education and employment initiatives, philanthropy, emission reductions and economic progress.

Did you know?

Pays a 2.83% dividend yield.

Current Price

$148.27

+0.41%

GoodMoat Value

$114.45

22.8% overvalued
Profile
Valuation (TTM)
Market Cap$30.79B
P/E21.06
EV$55.45B
P/B2.50
Shares Out207.68M
P/Sales1.95
Revenue$15.81B
EV/EBITDA12.75

DTE Energy Company (DTE) — Q3 2021 Earnings Call Transcript

Apr 5, 202612 speakers7,344 words74 segments

Operator

Good morning. My name is Brent, and I will be your conference operator today. At this time, I would like to welcome everyone to the DTE Energy Third Quarter 2021 Earnings Call. All lines have been placed on mute to prevent any background noise. After these speakers' remarks, there will be a question-and-answer session. Thank you, Barbara Tuckfield. You may begin your call.

O

Operator

Thank you, and good morning, everyone. Before we get started, I would like to remind everyone to read the safe harbor statement on Page 2 of the presentation, including the reference to forward-looking statements. Our presentation also includes references to operating earnings, which is a non-GAAP financial measure. Please refer to the reconciliation of GAAP earnings and operating earnings provided in the Appendix. With us this morning are Jerry Norcia, President and CEO; and Dave Ruud, Senior Vice President and CFO. And now, I'll turn it over to Jerry to start the call this morning.

O
JN
Jerry NorciaCEO

Well, thanks, Barbara, and good morning, everyone, and thanks for joining us. I have a lot of positive updates to share with you today. I'll be giving you an update on our 2021 performance and an overview of our long-term plan. Dave will then provide details on our financials. Then we'll take your questions. So let's start on Slide 4. On the second quarter call, I said that we were having a strong start to the year. And with three quarters of 2021 behind us, that description is still accurate, as we continue to deliver for our team, customers, communities and investors. This progress in 2021 positions us well for our future growth. DTE continues to be recognized for our engagement by Gallup with our ninth consecutive Great Workplace Award. In addition, we remain committed to our focus on diversity, equity and inclusion. Switching over to our customers. As you know, our service territory experienced some major storms. This summer, we had 12 storms with five having over 100,000 outages. It is something we have never seen in DTE's history. I would like to thank our entire team for really responding in incredible ways during these historic events. Our crews work countless hours to restore power to our customers, and for that, I am extremely grateful. We understand how important it is to provide reliable power and are committed to making continuous improvements as part of our service excellence efforts for our customers, both now and in the future. We have accelerated our efforts in the most impacted communities, including Wayne, Oakland and Washtenaw counties. In an effort to accelerate our preventative maintenance, we are increasing our tree trim workforce from 1,200 to almost 1,500 people, and our overhead line workforce from 850 to over 1,000. We made the decision to invest an additional $70 million in our tree trimming program from 2021 to 2023, as over two-thirds of our outages are tree-related. Additionally, we have been making significant investments and increasing our focus on grid reliability. We are advancing our efforts to get trees off the wires and deliver clean, safe and reliable energy, all while focusing on service excellence for our customers. We filed the distribution grid plan with the Michigan Public Service Commission in September. The plan addresses the long-term investment strategy that prepares our grid for the eventual electrification of transportation and addresses the increasingly severe weather patterns that we have seen in our service territory. Moving on to our communities. We are continuing our commitment to provide cleaner, more reliable energy. We have partnered with Washtenaw County to build our first MIGreenPower community solar project. The 20-megawatt facility will be the largest of its kind in the area. On the investor front, we continue to have a strong financial year and are well positioned to deliver growth. As you will see in our 2022 outlook and our five-year plan, we are on track to deliver 5% to 7% EPS growth through 2026 and dividend growth in line with our EPS growth. Now let's turn to Slide 5. 2021 is shaping up to be a very successful year. We are raising the midpoint of our operating EPS guidance from $5.77 to $5.84 per share. This is 14% growth in EPS from our original 2020 guidance. And I feel very confident that you'll see a final 2021 number but is at the higher end of our new operating EPS guidance range. I am proud that we're able to deliver these results while we continue to keep our electric base rates flat throughout most of 2022. We have not increased our electric base rates since May of 2020, and we don't plan to file our next electric rate case until early next year. For 2022, we are providing an operating EPS early outlook range of $5.70 to $5.97 per share. Even with the RFE earnings rolling off at the end of this year, we continue to deliver 6% growth from the 2021 original guidance midpoint. We will work towards hitting the higher end of that range as we have done in the past. Today, we are also announcing a 7% increase to our 2022 annualized dividend in line with the top end of our operating EPS growth target. As I mentioned on the last quarter call, we retired the River Rouge power plant this year, and we plan to retire Trenton Channel and St. Clair power plants in 2022. This is nearly 2,000 megawatts of coal retirements or 30% of our coal generation fleet. In this quarter, we made another significant step toward our goal of reducing carbon emissions. We announced that we'll be ceasing coal use at Belle River by 2028, two years earlier than originally planned, and we are preparing to file an updated integrated resource plan in the fall of 2022, almost one year earlier than planned. We look forward to working with all stakeholders to address ways to further accelerate decarbonization while always maintaining affordability and reliability for our customers. In order to ensure we continue to have clean, reliable and affordable power for our customers, we have built or contracted for 2,500 megawatts of wind and solar energy and purchased 1,200 megawatts of natural gas peaker plants. We expect our new state-of-the-art 1,100-megawatt combined cycle gas turbine plant to be up and running in 2022 to coincide with our coal retirements. Now moving over to the nonutility side, we are renaming our Power and Industrial segment to DTE Vantage. Through our unique vantage point, we are helping customers transform the way their energy is produced and managed to be substantially cleaner and more efficient. The name DTE Vantage better reflects our position in bringing innovative, cleaner energy solutions to our customers. Now let's turn to Slide 6 to review our five-year capital plan. Over the five-year plan, our utilities continue to focus on our infrastructure investment agenda, especially investments in cleaner generation and investments to improve reliability and the customer experience. Our updated five-year utility plan is $18 billion, which is $1 billion higher than the prior plan. Over 90% of our five-year investment plan will be at our two utilities. Investments in our non-utility business are strategically focused on our customers' needs and align with our aggressive ESG initiatives. Overall, we have a robust total investment agenda of $19.5 billion over the next five years. And as always, we continue to look for ways to bring more capital into the plan to advance our Clean Vision Plan and further improve reliability for our customers while maintaining affordability. Now let's turn to Slide 7. At DTE Electric, we announced our plan to accelerate decarbonization by ceasing coal use at the Belle River Power Plant by 2028, reducing carbon emissions by 50%, two years earlier than originally planned. This is another step toward our goal of net zero carbon emissions. Additionally, we expect to file our integrated resource plan in the fall of 2022, one year earlier than planned. By making this important generation decision now, DTE continues to accelerate our journey toward cleaner energy generation that is affordable and reliable for the customers and communities we serve. The $1 billion increase in our DTE Electric five-year plan is driven by distribution infrastructure investments, preparing our grid for electrification and hardening initiatives, and increased cleaner energy investment due to our voluntary renewable program, which is still exceeding our high expectations. This quarter, we have partnered with Washtenaw County to build our first MIGreenPower solar project. Overall, the MIGreenPower program, which is one of the largest in the nation, continues to grow at an impressive rate. So far, we have reached over 950 megawatts of voluntary renewable commitments with large business customers and over 40,000 residential customers. We have an additional 400 megawatts in advanced stages of discussion with future customers. For our distribution infrastructure renewal, we are supporting electrification and load growth through infrastructure redesign, improving circuit reliability and reducing restoration times with system hardening and enabling a smarter grid with advanced technology and automation. This $15 billion investment over the next five years supports our long-term operating earnings growth of 7% to 8% for the electric company. And now let's discuss the opportunity at our gas utility on Slide 8. At DTE Gas, we are on track to achieve net zero greenhouse gas emissions by 2050. Earlier this year, we announced our new Natural Gas Balance program. This program provides the opportunity for customers to purchase both carbon offsets and renewable natural gas to enable them to offset up to 100% of the carbon from their natural gas usage. We are proud of how fast this program is growing. Earlier, we had over 4,000 customers subscribed, and we look forward to seeing it become as successful as our voluntary renewable program at DTE Electric. Overall, at DTE Gas, we are planning on investing $3 billion over the next five years to upgrade and replace aging infrastructure with potential upside to the plan of $500 million. Along with our pipeline integrity and main replacement investments, we are investing in innovative technology and products that will reduce methane emissions and the carbon footprint for our company. Overall, we expect our long-term operating earnings growth to be 9% at DTE Gas. Now let's turn to Slide 9. As I mentioned earlier, we renamed our Power and Industrial business to DTE Vantage. We are planning on investing between $1 billion to $1.5 billion at this segment over the next five years. We are targeting operating earnings of $85 million to $95 million in 2022, growing to $160 million to $170 million in 2026, with approximately 80% of the operating earnings in this business coming from decarbonization-related projects. As the REF business sunsets at the end of this year, we continue to see additional opportunities in renewable natural gas and industrial energy services. Earlier this year, we told you about a new RNG project in South Dakota, which is now under construction and slated to start up in the second quarter of next year. We commenced construction on another Wisconsin RNG project in the third quarter and entered into an agreement for an additional RNG project, which will be our first project in New York. In aggregate, these three projects will serve the vehicle fuel market producing over 500,000 million BTUs of RNG per year, with 100% of the production off-take contracted long term. There has been strong RNG market growth, supported by the Federal Renewable Fuel Standard and California's Low Carbon Fuel Standard. We are uniquely positioned to capitalize on a growing preference for efficient energy, with the opportunity to implement coal generation systems, especially as manufacturing plants continue to open up nationwide. This also puts us in a very good position to explore additional decarbonization opportunities, including carbon capture and storage. And with that, I'll turn it over to Dave to give you a financial update. Dave, over to you.

DR
Dave RuudCFO

Thanks, Jerry, and good morning, everyone. Let me start on Slide 10 to review our third quarter financial results. Total operating earnings for the quarter were $334 million. This translates into a $1.72 per share. You can find a detailed breakdown on our EPS by segment, including a reconciliation to GAAP reported earnings in the Appendix. I'll start the review at the top of the page with our Utilities. DTE Electric earnings were $342 million for the quarter. This was lower than the third quarter of 2020, primarily due to cooler weather in 2021 and higher storm costs, partially offset by higher commercial sales. Moving on to DTE Gas. Operating earnings were $10 million lower than the third quarter last year. The earnings decrease was driven primarily by higher O&M expenses and rate-based growth costs, partially offset by the rate implementation. Let's keep moving down the page to DTE Vantage on the third row. Operating earnings were $73 million. This is $26 million higher than the third quarter of 2020, driven primarily by REF earnings and new RNG projects. On the next row, you can see energy trading had another solid quarter, with operating earnings relatively flat quarter-over-quarter. Finally, Corporate & Other was unfavorable $3 million quarter-over-quarter. There are a couple of main drivers for this variance. The largest driver is the timing of taxes, which will reverse in the fourth quarter. We also had a one-time tax item true-up subsequent to the spin of DTE Midstream. As we look forward to the balance of the year, the tax timing adjustments for the first three quarters will result in approximately a $50 million favorable reversal in the fourth quarter. So our full year 2021 results at Corporate & Other are expected to fall within our guidance for that segment. Overall, DTE has earned $1.72 per share from continuing operations in the third quarter of 2021. This represents a very strong third quarter and our year-to-date results put us in a great position for the year. Let's turn to Slide 11. As Jerry mentioned, we are raising the midpoint of our 2021 operating EPS guidance from $5.77 to $5.84 per share. Our revised operating EPS guidance range for 2021 is $5.70 to $5.98 per share. And with strong year-to-date performance, we expect our full year operating EPS to be biased towards the higher end of this range. This bias to the higher end also reflects the additional investment in reliability as we are investing $70 million to combat extreme weather-related power outages with no impact to our customer bills. Additionally, we've contemplated some further invest opportunities in our businesses during 2021, which positions DTE well for success in future years. Let's move on to Slide 12 to discuss our 2022 outlook. We are continuing strong 5% to 7% long-term operating EPS growth through some significant milestones. We are converting $1.3 billion of mandatory equity in '22, and the REF business will sunset at the end of 2021. Through this, we will achieve 6% growth from 2021 original guidance. Our 2022 operating EPS early outlook midpoint is $5.84 per share, and we will work toward hitting the higher end of our range of $5.70 to $5.97 per share. In 2022, at DTE Electric Group, growth will be driven by distribution and cleaner generation investments. DTE Gas will see continued customer-focused investments in main renewal and other infrastructure improvements to support our capital plan. As we discussed, 2021 is the final year of earnings for our reduced emission fuels business at DTE Vantage, approximately $90 million of REF earnings net of associated costs rolls off at the end of the year. This is offset by new project earnings in 2022. 2022 earnings at this segment are largely driven by continued RNG and industrial energy services projects that will serve as a base for growth going forward. At Corporate & Other, the biggest driver in our year-over-year improvement is lower interest expense. This is the result of leveraging earnings and cash strength in 2021 to opportunistically remarket some higher-priced debt. This will provide interest savings in 2022 and future years. Let's turn to Slide 13 to discuss our balance sheet and equity issuance plan and wrap up before taking your questions. We continue to focus on maintaining solid balance sheet metrics. Due to our strong cash flows, DTE has minimal equity issuances in our plan beyond the convertible equity units in 2022, while also increasing our five-year capital investment plan by $1 billion. We have a strong investment-grade credit rating and target an FFO to debt of 16%. Additionally, we are increasing our 2022 dividend by 7% to $3.54 per share. In the third quarter, we completed our liability management plan following the spin of our Midstream Business. Using the funds raised from DTM's debt issuance, we repurchased a little over $2.6 billion of corporate debt and incurred approximately $400 million of debt breakage fees associated with the early retirement of the debt. Since this debt was allocated to the midstream business in our previous financial statements, you won't see a large decrease in the debt level at Corporate & Other. This liability management plan is NPV positive, EPS accretive, and further supports our long-term growth. So in summary, we feel great about our success so far this year and are confident in achieving our increased 2021 guidance. 2022 is looking good with 6% EPS growth from the 2021 original guidance and our increased five-year capital plan supports our 5% to 7% long-term growth while delivering cleaner generation and increased reliability for our customers. DTE continues to be well positioned to deliver the premium total shareholder returns that our investors have come to expect over the past decade with strong utility growth and a dividend growing in line with EPS. With that, I thank you for joining us today, and we can open the line for questions.

Operator

Your first question comes from Shar Pourreza with Guggenheim Partners. Your line is open.

O
SP
Shar PourrezaAnalyst

Regarding the capital expenditure plan, how are you currently evaluating spending on generation? You announced that Belle River would stop coal operations sooner than anticipated. Are there additional spending opportunities for generation, particularly relating to the integrated resource plan filing? Are there any specific strategies you are considering, Jerry? We've noticed more aggressive proposals from your Michigan counterparts. I'm wondering if you can transition away from coal by the 2030 to 2035 timeframe. Also, is there a chance to give an early preview of the integrated resource plan at the EEI before next year's filing? There are a few questions embedded here.

JN
Jerry NorciaCEO

Sure. We've accelerated the conversion of the Belle River Power Plant from coal to other fuel sources such as natural gas, RNG, and potentially hydrogen, which is set to be completed by 2028. Next year, we plan to file an Integrated Resource Plan and will take the time to gather feedback from stakeholders like the commission and other interested parties regarding our coal retirement acceleration. The Monroe coal plant is scheduled to retire in 2040, but we are exploring various scenarios to move that date up. The specifics of how we will achieve this and replace the over 3,000 megawatts of baseload generation will be clearer when we file the IRP. We must carefully consider how to maintain reliability and affordability while getting input from stakeholders. In our current five-year outlook, there is an increase of about $1 billion in cleaner generation, mainly due to our investments in voluntary renewables, along with some investments at our Omtydro facility and a small hydrogen pilot project at the Blue Water Energy Center.

SP
Shar PourrezaAnalyst

And then, Jerry, just a question on '21 guidance and sort of how you plan to offset some of the storm and other headwinds from 3Q that were not in the plan, right? What sorts of discretionary spending flex do you have? And does that kind of differ anything into '22? So I guess I'm asking about contingency and flex and if you're using any of that in '22.

JN
Jerry NorciaCEO

We're going to deliver 2021. All of those storm costs are already reflected in our results and in our current guidance for 2021. So I can tell you I'm extremely confident in delivering in 2021. And as Dave and I mentioned in our speaker description, we'll likely deliver at the high end of that. So we're feeling really strong about '21. I have no concerns about delivering in 2021, and for 2022, just to speak about that for a moment. As usual, we spent all of the year building levels of contingency to ensure the delivery of 2022. And as you've seen in the past, if we don't consume that contingency, then we'll trend towards the higher end of guidance. So again, '21 is locked in and trending towards the higher end of that guidance, and '22 is feeling really good and really strong at this point in time. As a matter of fact, we're busy working on '23 to build a strong plan for 2023.

SP
Shar PourrezaAnalyst

That's exactly what I was aiming to clarify. Lastly, regarding energy trading, we're noticing a significant increase in commodity prices, particularly with gas now exceeding $6 for the winter. Jerry, how is our portfolio managing the volatility associated with gas? Are there any risks with counterparties, especially considering the situation we observed in Texas this year? Additionally, do you see any opportunities for improvement in this area?

JN
Jerry NorciaCEO

Our portfolio is slightly long as it relates to natural gas, Shar. So if anything, there's a bias for upside as commodity prices in the gas business have gone up. So that would, certainly, bias for some level of upside.

Operator

Your next question comes from the line of Jeremy Tonet with JPMorgan. Your line is open.

O
UA
Unidentified AnalystAnalyst

It's actually Ryan on for Jeremy. Just kind of wanted to start on the DTE Vantage in that $160 million, $170 million laid out in 2026. Just wonder if you can kind of talk through the line of sight you have to that number? And then I know you have been very successful with the RNG projects, and that has been trending well, but thinking through the carbon capture side, how much kind of growth capital you think you could deploy there in the near term? And how much the kind of current legislative environment with the 45Q support that? Or how much you might need support on that side to make those projects more economic?

JN
Jerry NorciaCEO

So I'll start by saying that the way we get to our guidance for DTE Advantage is we continue to deliver $15 million of net income growth per year. And that's really underpinned by us being very selective about what RNG projects we do and what cogeneration projects we do. Those are our two major business lines. So just to give you a feel for it, we'll complete construction of the Dakota Plains project in 2022. And then we've got a Wisconsin project that will go in service in 2022 as well. And we got a third one in New York that will likely be placed into service in '22 or early '23. In addition, we have a cogen facility that goes online in 2022. All of that builds for our growth into 2023 and beyond, as well as we've got a handful of really strong opportunities in the pipeline in the RNG space and cogen space that we'll keep marching along. Again, $15 million in new net income is something that we feel is reasonable to achieve each and every year. And that's how we got to our $90 million for 2022 by knocking off $15 million a year for five years. So we're just going to continue on that trend and deliver for you all.

UA
Unidentified AnalystAnalyst

That makes sense. Carbon capture...

JN
Jerry NorciaCEO

Yes. I was going to speak to carbon capture. That's early for us. The 45Q is very good, but the low carbon fuel standard in California makes it even more interesting. So we are looking at potential carbon capture opportunities, but I'd tell you, it's extremely early at this point in time. But we'll continue to update you as we make progress in that arena.

UA
Unidentified AnalystAnalyst

Got it. That makes sense. I just wanted to follow up a little bit on the Electric CapEx and kind of thinking through the voluntary renewables. I think you said 950 megawatts and then another 400 megawatts is kind of in advanced negotiations. How should we be thinking about what is kind of currently embedded in the current capital plan? And then how much is kind of further upside opportunity? Is it fair to assume that 400 megawatts is just a further opportunity at DTE Electric through the voluntary renewables program?

JN
Jerry NorciaCEO

The 400 megawatts will significantly contribute to the $3 billion outlined in our five-year plan. This gives us strong confidence in achieving the $3 billion goal for clean generation that will be presented on Slide 7. Is there potential for further growth? Yes, likely. Each year, we reevaluate our clean generation expectations, considering coal retirements and the increase in voluntary renewables. All of this suggests future growth in our investments in cleaner generation.

Operator

Your next question comes from the line of Julien Dumoulin-Smith with Bank of America. Your line is open.

O
JD
Julien Dumoulin-SmithAnalyst

Thank you so much for the opportunity. Well done all around here. A quick question here. I know you guys are talking about planning already all the way out to '23. But how are you thinking about just responding to the storms from this last summer? Obviously, resiliency and reliability are of paramount importance. Are there incremental capital opportunities here? We've heard some of your peers contemplating expanding, for instance, undergrounding and other sorts of reinforcement opportunities around some of these latest rounds of storms as well as potentially baking in any incremental OpEx into your, for instance, '22 plan as you think about responding to the PSC here?

JN
Jerry NorciaCEO

Let me address those points individually, Julien. As you've noted, we filed a regulatory submission to utilize some of the favorable results from 2021 and enhance our tree trimming efforts with at least $70 million in additional funding. This will allow us to employ 200 to 300 extra tree trimmers in the state to clear trees away from our power lines. This is our immediate course of action. We will track this through our tree trimming program, which will benefit our customers by improving reliability for this summer and future summers. We are indeed looking to speed up our tree trimming initiative with this additional investment, which will range from $70 million to $90 million. Additionally, in our capital plan, we have increased our investment in distribution infrastructure from $7 billion to $8 billion. This adjustment comes in light of our thorough planning presented to the commission, addressing the need for resiliency in response to worsening weather patterns and preparing for the electrification of the transportation sector, which we expect to have a significant impact in the latter half of this decade. We are already witnessing over 1,000 new connections to our grid from electric vehicles, a notable increase from just a few hundred last year. All these efforts are aimed at utilizing the $8 billion to develop a more resilient, reliable, and efficient grid.

JD
Julien Dumoulin-SmithAnalyst

Excellent. I want to revisit the $15 million. If I'm correct, the $90 million baseline you mentioned was based on 2022, and it seems like the $155 million might be even better than the 15% increase. My numbers could be slightly off, but this appears to be a positive trend. I'm not trying to rehash too much from the last question, but regarding the outlook on fixed versus today, it seems at the very least to be a solid indicator, especially given the accelerating backdrop compared to what you've already committed at $15 million a year. There could even be more opportunities here. You briefly mentioned the incremental cogens, but I'd like to push you a bit further on how much clarity you have regarding that $155 million compared to the incremental.

JN
Jerry NorciaCEO

Dave, I'll let you start, and then I'll jump in as well.

DR
Dave RuudCFO

I'd say like Jerry said, we have a really good pipeline of projects within our DTE Vantage business right now. And so getting that $15 million a year is right within our sights. And one of the keys, Julien, as we've gone through this before, is staying within 10% of our business being nonutility. And so that's also one of the drivers that kind of keeps us from pushing that too much. There's always other ways that we can look at that if we did find some more growth, but that's also one of the limiters for our growth as well.

JN
Jerry NorciaCEO

And, Julien, that gives us the opportunity to be really selective. Right now, we're still seeing RNG projects that we are originating, and they're all greenfield. And that's how we're creating the greatest amount of value. We're seeing three- to five-year simple cash paybacks, and IRRs and the team, some levered IRRs and teams. So we like the approach that we have, and it also meets our strategic goals of, like Dave said, keeping a 90-10 split between utility and nonutility.

JD
Julien Dumoulin-SmithAnalyst

Right. No, I didn't mean to nitpick. I was just suggesting that the 2026 seems like it's even better than 15% a year. And I was just coming back to that. Sorry. Thank you guys very much, and I appreciate it. I leave it there.

JN
Jerry NorciaCEO

Thanks, Julien.

Operator

Your next question comes from the line of Insoo Kim from Goldman Sachs. Your line is open.

O
IK
Insoo KimAnalyst

A lot of my questions have been asked and answered. But just on the financing side of things, you've laid out through 2024 now minimum equity needs. And when we think about this additional $1 billion over the roll forward, five-year plan. Any insight into that '25, '26 period, whether at least in this base plan for now, whether you'll need any more equity in terms of the back half of the plan?

DR
Dave RuudCFO

Yes, we see really good cash flow generation through our five-year plan. And so that minimal equity needs like that's consistent right now within our plan, even bringing in this additional $1 billion of capital into the plan.

IK
Insoo KimAnalyst

Understood. My follow-up question is, Jerry, your company has a history of being conservative with your annual guidance and consistently exceeding it, as seen in 2022. The 6% growth you've mentioned makes sense. Given that this is the second time this year you are raising guidance, are there not as many operational opportunities to accelerate costs into the next year? This would help create a smoother year-over-year earnings growth. I'm curious because some investors and analysts are looking for more stability and predictability in annual earnings growth, despite your history of outperforming guidance. Any insights on this would be appreciated.

JN
Jerry NorciaCEO

Sure. I'll start by saying that if you look at our track record over the last decade, you would see that our EPS growth on a CAGR basis is one of the highest in the industry. I think it's tracking probably well over 8% at this point in time, if we were to include this year. So we're pretty proud of our EPS growth track record. We are conservative in our planning in the sense that we do put contingencies in to anticipate any potential variations in either load or weather at our two biggest income producers, which are utilities. Again, as I mentioned, for 2022, I feel really good about the level we're planning that's gone into 2022. If we do not consume our contingency, we'll be tracking towards the higher end of that guidance. For 2023, we're putting that year together, and I expect that, that will come together just as nicely as '21 and '22 and the last decade had.

Operator

Your next question comes from the line of Travis Miller with Morningstar. Your line is open.

O
TM
Travis MillerAnalyst

I wonder if you could give some thoughts on the latest developments in the gas rate case the various filings there?

JN
Jerry NorciaCEO

Sure. We've had multiple interveners including the staff and the EG and now the administrative law judge filed their positions. When we take all of that into consideration, we feel pretty good about the outcome that we expect from the gas rate case. We really believe we'll get a productive outcome and that we'll meet our needs and our investors' needs.

TM
Travis MillerAnalyst

Okay. Is there sensitivity in the 2022 guidance regarding what the final outcome might be on the gas case?

JN
Jerry NorciaCEO

Certainly, part of our contingency planning is to try and accommodate various scenarios. But I would say that you'll see a productive outcome on ROE, which is really important to our investors. The commission has taken a past practice of gradual approaches to ROE and has also taken a pretty fair stance on our capital deployment plans and the investments that we've made in the gas business. I think we're going to get a really productive outcome that will help us deliver our 2022 targets.

TM
Travis MillerAnalyst

And that's all supportive of the CapEx numbers that you were putting out there for the next few years, right?

JN
Jerry NorciaCEO

That's correct. We've got strong support from commissioners and the staff on our CapEx program at the gas company. It really is about infrastructure renewal. We're replacing about 200 miles of gas main every year by replacing the cast iron with new PVC piping and moving about 30,000 meters from inside the home to outside of the home. All of that is focused on the future safe and reliable operation of our gas infrastructure. So lots of support for that, strong support not only from the commission, but also from the administration who's built infrastructure renewal in the state.

Operator

Your next question comes from Jonathan Arnold with Vertical Research. Your line is open.

O
JA
Jonathan ArnoldAnalyst

Just one question on the gas utility. CapEx plan. You said, I think, there's $0.5 billion of incremental opportunity sitting on top of the base plan, which is sort of similar to how that looked last year, possibly the year before, I was just checking. But Jerry, can you give us a sense of what's in there and what the timing and sort of forums or getting some of that into the plan would be?

JN
Jerry NorciaCEO

Sure. We've brought in about an extra $100 million into this current five-year outlook, incremental. We are always looking for opportunities to bring more. We've got a very large inventory of infrastructure retail needs of the gas company. Primarily starting to point towards some of our transmission assets like aging compressor stations and also aging pipelines that are going to start to need some level of replacement in the transmission portion of our operation. So what stands in the way of getting incremental capital into the plan is really us finding affordability opportunities to offset the rate pressure that these investments would create, so that's what would bring it in, Jonathan. So we'll continue to update that plan each and every year and try to bring more CapEx into the plan to accelerate our work in relation to infrastructure renewal.

JA
Jonathan ArnoldAnalyst

Okay. Should we consider it as part of the upcoming rate case cycles instead of other regulatory value?

JN
Jerry NorciaCEO

That's where you will see it; that's where it will be most transparent.

Operator

Your next question is from Ryan Levine with Citigroup. Your line is open.

O
RL
Ryan LevineAnalyst

What's the current gas hedge position for DTE Gas heading into the winter?

JN
Jerry NorciaCEO

The current hedge position for gas is 90% heading into this winter and about 65% heading into the following winter of '22/'23.

RL
Ryan LevineAnalyst

Do you have a sense of what the net customer bill impact will be this winter as a result of that hedge profile and the current cash prices?

JN
Jerry NorciaCEO

It will be pretty minimal since we've secured about 90% of our gas supply at fixed prices. In other words, the prices are fixed for about 90% of the portfolio. So we see a very minimal impact.

RL
Ryan LevineAnalyst

Thank you. Regarding the storm impacts, there has been communication from the governor and a request for information from the commission about some of the underperforming circuits. I would like to know what the additional cost would be for undergrounding that might make it a more feasible option. Also, are there any developments that could lead you to change your current strategy from tree trimming to another form of mitigation?

JN
Jerry NorciaCEO

So I'll start by saying that about a little over 30% of our system is underground now. In the '70s, we started to underground all new subdivisions and all new developments. We have been underground for quite a few years. What remains above ground in residential neighborhoods primarily is infrastructure that's older than that. We've looked at and continue to look at ways to strategically underground. But it is very expensive. So you have to be very strategic about how you do it. Just to give you an idea, about seven or eight years ago, I was asked by a mayor of one of the communities that we serve whether we could underground the whole system. It was a community of 14,000 residents, and the cost to underground was in the hundreds of millions of dollars. The cost to trim those circuits was $200,000 or $300,000, and that would give us about 95% of the same reliability impact. Again, undergrounding is great. I think we have to approach it in a strategic manner. That is a question that we're addressing in our distribution plan, five-year plan that we put in front of the commission, and we'll continue to work to find strategic ways to underground. But it is very cost prohibitive to take existing systems and underground them and also disruptive to our customers in that the locations where you have to underground, you have to remove the trees, tear up front lines and driveways as well as backyards potentially when systems are in people's backyards.

RL
Ryan LevineAnalyst

Appreciate it. And maybe one last follow-up. In terms of the potential penalties that could be ascribed for future storm outages. Any color you can provide around how you're approaching that potential issue and if any of these mitigation efforts could play into that decision?

JN
Jerry NorciaCEO

Many of the mitigation efforts that we're deploying, increased tree trim and of course, an $8 billion investment agenda in the grid, I think, will go a long way to fundamentally improving the reliability of the grid. In terms of customer credits that we provide, we are revisiting that with the commission, and we expect to resolve that over the next 12 to 18 months. We think that the $25 credit for extended periods of outage is outdated, and we agree that it needs to be increased, and we just need to arrive at a level that makes a lot of sense because all of the money that you put towards credit can also be used to improve the infrastructure. There is a balance there. But also a recognition of some of the difficult situations that low-income customers find themselves in when we have outages that may last three or four days.

Operator

Your next question comes from Andrew Weisel with Scotiabank. Your line is open.

O
AW
Andrew WeiselAnalyst

Just to elaborate on the winter gas prices. You just talked about the hedge position for gas. What about the electric side? Can you remind us what tools you have? I think you have some hedging programs and access to storage. Is that right?

JN
Jerry NorciaCEO

For the electric side, we're primarily burning coal as our primary fuel source at this point and also nuclear fuel. Those are well hedged at this point, and we burn a minimal amount of natural gas at this point. Now when we bring on our combined cycle plant, we will be burning a significant amount more natural gas, and we'll look to hedge those products as that plant comes into service late 2022.

AW
Andrew WeiselAnalyst

Okay. Good. So also minimal risk to customer bills this winter.

JN
Jerry NorciaCEO

Yes.

Operator

Your next question is on the electric rate case filing coming up. I believe you're planning to file by year-end. Remind us, will the $70 million tree trimming initiative be part of that? Or will that be resolved before you file? And beyond that, should it be a pretty plain vanilla case? Or are there any other unusual items to focus on?

O
JN
Jerry NorciaCEO

We're planning to file in the first quarter of next year, so it won't be at the end of this year. The tree-trim matter will be resolved before that filing. Again, as we will use a special accounting order to take capability from 2021 to roll into our tree-trim program, and that will be sized anywhere from $70 million to $90 million. And then, of course, the filing that we will make in the early first quarter will be primarily driven by the capital investment agenda that we have for the electric company, both our renewables agenda and our grid agenda.

AW
Andrew WeiselAnalyst

Great. Then just one quick bookkeeping question. The $70 million tree-trim program, I believe that will be expensed and included in operating results not stripped out, right? And if so, would that be a fourth quarter item?

JN
Jerry NorciaCEO

Yes, it would. Yes, we'd be setting up a regulatory liability and it would impact the fourth quarter as well.

AW
Andrew WeiselAnalyst

Okay. So that's included in the updated 2021 guidance?

DR
Dave RuudCFO

Yes, it's included in our guidance right now. And even with that $70 million, we're still really confident we're going to hit the number in the upper end of that.

Operator

Your next question comes from Anthony Crowdell with Mizuho. Your line is open.

O
AC
Anthony CrowdellAnalyst

It just seems like yesterday when everyone was questioning NEXUS and now we're at $6 gas.

JN
Jerry NorciaCEO

Yes, EPM is doing quite well in this environment as we expected.

AC
Anthony CrowdellAnalyst

I just have one question, kind of a follow-up from one of the earlier questions. I mean, I think you talked about bill impact is minimal. It seems that DTE has a strategy with nuclear plants, coal plants, gas plants and the bill impact is minimal. Do you sense, though, that showing the strength of having the diversified portfolio, there may be a change in regulators supporting retiring coal earlier given that it's really mitigated the bill impact?

JN
Jerry NorciaCEO

We haven't seen that yet, Anthony, but I would say one of the things that I hear a lot in the industry that we are also considering is to keep all our options open, right? We've seen some significant reliability impacts by retiring baseload generation and replacing it with intermittent resources. Now we love renewables; we obviously are a big investor, the largest investor in renewables in our state. But we also feel that reliability is paramount. When we think about our coal plants and the conversion of those or retirement of those, we really need to think carefully how and when we do it because the first thing our customers want is reliable power, affordable power and cleaner power. All of those have to be balanced. I would say keeping our options open to ensure that we have reliable power as we make this transition is going to be extremely important. You'll see that in our IRP. We will accelerate our coal retirements in our IRP that you'll see next fall. But you'll also see careful consideration on how that's done to ensure reliable power and affordable power and clean power to go with it.

AC
Anthony CrowdellAnalyst

Great. Looking forward to seeing you guys down at the EEI.

JN
Jerry NorciaCEO

Yes, I look forward to seeing you too.

Operator

There are no further questions at this time. Mr. Norcia, I turn the call back over to you.

O
JN
Jerry NorciaCEO

Well, thank you, and thank you, everyone, for joining us today. I'll just close by saying that we're feeling really good about the remainder of 2021, as you've heard, and also have developed a very strong position for 2022. I hope everyone has a great morning, stays healthy and safe. I look forward to seeing all of you live at EEI in November. Thank you.

Operator

Ladies and gentlemen, thank you for your participation. This concludes today's conference call. You may now disconnect.

O