PG&E Corporation is a holding company headquartered in San Francisco. It is the parent company of Pacific Gas and Electric Company, an energy company that serves 16 million Californians across a 70,000-square-mile service area in Northern and Central California. Each of PG&E Corporation and the Utility is a separate entity, with distinct creditors and claimants, and is subject to separate laws, rules and regulations.
A large-cap company with a $35.6B market cap.
Current Price
$16.21
-1.46%GoodMoat Value
$12.45
23.2% overvaluedPG&E Corp (PCG) — Q4 2023 Earnings Call Transcript
Original transcript
Operator
Thank you for standing by. And welcome to the PG&E Corporation Fourth Quarter 2023 Earnings Release Call. I would now like to welcome Jonathan Arnold, Vice President of Investor Relations to begin the call. Jonathan, over to you.
Good morning, everyone, and thank you for joining us for PG&E’s Fourth Quarter 2023 Earnings Call. With us today are Patti Poppe, Chief Executive Officer; and Carolyn Burke, Executive Vice President and Chief Financial Officer. We also have other members of the leadership team here with us in our Oakland headquarters. First, I should remind you that today’s discussion will include forward-looking statements about our outlook for future financial results. These statements are based on information currently available to management. Some of the important factors which could affect our actual financial results are described on the second page of today’s earnings presentation. The presentation also includes a reconciliation between non-GAAP and GAAP financial measures. The slides along with other relevant information can be found online at investor.pgecorp.com. We would also encourage you to review our Annual Report on Form 10-Q for the year ended December 31, 2023. With that, it’s my pleasure to hand the call over to our CEO, Patti Poppe.
Thank you, Jonathan. Good morning, everyone. This morning we reported full year core earnings of $1.23 delivering at the high end of our annual guidance range. This result represents growth of 12% over our 2022 results of $1.10. In the fourth quarter, we recognized the full year benefit of our 2023 general rate case as expected. I’m also pleased to announce that we exceeded our 2% annual non-fuel O&M savings target for the second consecutive year with savings coming in at 5.5% and pushing our EPS to the high end of the range. Because these savings were predominantly generated by reducing waste and improving service, they benefit customers today and benefit investors for years to come. Looking to 2024, we are reaffirming our at least 10% growth target which is now based on our actual 2023 results of $1.23. This results in an increase to our 2024 core earnings guidance range with a new higher midpoint of $1.35 versus our previous guidance of $1.33. We also reaffirm our commitment to at least 9% core EPS growth for both 2025 and 2026, rebased off our actual 2023 results in our new 2024 range. In addition, I'm pleased to share that we're extending our core EPS growth guidance of at least 9% for an additional two years through 2028. Our needed customer investment leads to strong rate-based growth, which continues to be the primary driver of our future earnings growth. We're providing you with updated five-year forecasts for both rate-based and CapEx in today's slides. These numbers now extend to 2028 and show a consistent compound annual growth rate of 9.5% using the new base year of 2023. Finally, we reaffirm our commitment to no new equity in 2024 and remain committed to pursuing the most efficient forms of financing available for 2025 and beyond, which Carolyn will discuss in her remarks. On slide four, we've added 2023 actuals illustrating our high end of guidance results and the rebasing of forward year growth rates now through 2028. This is our simple, affordable model in action. The list in 2023 reflects our 5.5% non-fuel O&M reduction well above our 2% plan. Slide five is a reminder of the key elements of our simple, affordable model, which allows us to continue growing customer capital investment at 9% or more while containing customer bill increases at or below assumed inflation in the 2% to 4% range. Key enablers in the model are ongoing annual non-fuel O&M reductions of 2%, efficient financing, and electric low growth in the 1% to 3% range. The proof is in the numbers. The simple, affordable model works. You first saw slide six during our November business update call. This version has been updated for a few additional known items, such as the 2024 cost of capital trigger. Our new ROE of 10.7% took effect on January 1st this year, with collections beginning this month in gas rates and next month for electric. Delivering on this projected 2% to 4% bill growth trajectory is an essential element of the PG&E plan, and one which will be important for building trust with our customers over the long run. For our average gas and electric residential customer, average monthly bill increases are limited to the 2% to 4% range from 2023 through 2026. I wanted to be clear that this includes the step up in 2024 as we implement the GRC and other deferred cost recoveries. Our plan shows average bills stepping down, beginning later this year and further in both 2025 and 2026, keeping the average annual increase in the lower half of the 2% to 4% range as catch-up recoveries roll off. Two of the larger items are around $1 billion of 2022 WMCE interim rate relief, which comes off bills in mid-2024, and the 24-month collection of our first-year GRC revenues, which come off at the start of 2026. Let me say that again. Based on what we know today, our bills will rise at the lower half of the range, around 2.5% per year on average for the duration of this rate case from 2023 through 2026. Let's shift gears to the significant progress the team has made on risk mitigation. Slide seven updates our 2023 admission data for the full year. Total CPUC reportable admissions came in at 65% for 2023, down 68% from the 2017 baseline, and 29% down from 2022. On the right side of the slide, we're showing our weather normalized ignition rate, which is a metric from our wildfire mitigation plan. This year's number of 0.93 was a reduction of 71% from 2017, and our lowest annual number since we began calculating this metric. The metric demonstrates that we continue to drive down wildfire risk in 2023, even after adjusting for fewer circuit mile days under our three or higher conditions when the risks of catastrophic wildfire are highest. While we're extremely pleased with these results, our team certainly isn't stopping here. We see further opportunities to drive overall wildfire risk reduction beyond the 94% achieved in 2023, as we continue with additional system hardening and deployment of new technologies. In addition to the physical risk reduction, financial risks are also lower, including key protections under AB 1054, which were reaffirmed with the issuance of our annual safety certificate last month. Looking forward, here on Slide eight, we want to take a moment to highlight how we see PG&E offering investors a truly differentiated, high-quality utility growth story. This starts with premium rate-based growth and industry-leading 9.5%. What sets us apart is our commitment to make this investment affordable for our customers. The key enabler is our ability to drive consistent non-fuel O&M savings as we deploy our lean operating system in a utility, which previously saw cost compound at an annual 10% rate over the prior five years. As a reminder, several years of doing whatever was necessary to respond to back-to-back crises pushed our capital-to-expense ratio far below the industry average. This is where we have a wealth of opportunity and a long runway to drive efficiencies with sustainable savings benefiting both our customers and our investors. We expect future load growth related to California's leadership in electrification to be a further differentiator and one which will help keep customer bill growth within our 2% to 4% forecast. In addition to continued adoption of electric vehicles throughout our service territory, we have seen a three-fold increase in data center applications in 2023 versus the prior four years. We plan to speak more about these load growth trends over the course of this year, including at an investor meeting which we are planning for June 12th in New York, so please mark your calendars for that. The fundamental differentiators of rate-based growth, O&M savings, and load growth, we would add our constructive state regulatory and policy environment in California. Key elements of the California regulatory model include four years of revenue certainty under the GRC, returns which are set separately from the GRC including a formulaic adjustment mechanism, and timely recovery for pass-through of important cost categories including fuel and pension. With our GRC resolved, we now have revenue certainty extended through 2026, giving us the best level of regulatory visibility we've had since I joined PG&E and something which any regulated utility would love. This brings me to our performance playbook, including our lean operating system, which is becoming a critical differentiator for PG&E as we continue building a sustainable culture based on continuous improvement and what we refer to as breakthrough thinking. And so, on slide nine, to my story of the month, or in this case, the story of the year. Let me first take you back to the beginning of 2023. We had a goal to underground 350 miles of electric lines at a unit cost of $3.3 million per mile. We started 2023 with only about five miles of civil construction fully complete. At that point, we had hundreds of miles still to design, thousands of individual easements to negotiate, 345 miles of trenches to dig, and 350 miles of cable to pull. And then, the winter storms hit. 15 atmospheric rivers to be exact, which brought civil work to a near standstill through April. So, how did we deliver on 2023 undergrounding plan? As scoped, on time, and at better than targeted unit cost performance? Well, during a visit with our board of directors in December, I watched proudly as the undergrounding team described how they use the PG&E performance playbook every day and at every level. What they shared wasn't one silver bullet, not just a breakthrough idea or a value stream map or a waste elimination. Rather, it was this team's commitment to living the culture, using the tools, and building the capabilities that enabled our results and which will cause future success. In 2023 alone, the undergrounding team eliminated $68 million in waste for the benefit of our customers. They did this by updating our standards, deploying optimal construction methods, and better managing spoils. With additional improvements, average unit cost came in below our target of $3.3 million to just under $3 million per mile. And the average construction cycle time improved from five and a half months back in February 2023 to three and a half months today. This was a total game changer in meeting and exceeding our 350-mile goals. Thanks to our 2023 undergrounding efforts, we can avoid proactively turning off power to about 15,000 households during dangerous high wind events. These customers who live in our highest risk areas can now sleep at night knowing they do not have to trade safety for reliability or worry that a tree might land on the power line in their backyard. This is climate resilient infrastructure for all weather conditions and for generations to come. The team reminded us that before lean we would have managed the underground efforts through spreadsheets and phone calls. That was the old PG&E way. The undergrounding team is showing us the new PG&E. Imagine the impact our performance playbook can have enterprise-wide. It's great that we achieved our 2023 goals. What's even better is that we've created a playbook enabling consistent premium performance year-end and year-out. As I like to say, performance is power. This means delivering safe, affordable and reliable service to our hometowns along with consistent predictable financial results. With that, let me turn it over to Carolyn.
Thank you, Patti, and good morning, everyone. Today I'm excited to cover three topics with you. First, a recap of our 2023 results. Second, our differentiated growth opportunities. And third, how are we making this growth affordable for our customers by executing on our simple, affordable model? Starting here on slide 10, I'm pleased to report that we met or exceeded all of our 2023 goals, both operational and financial. And we're on track for each of our longer-term commitments. Our 2023 report card is another proof point that our performance playbook is working. The culture and capabilities we are building here at PG&E are enabling our delivery of consistent, predictable results. It's a virtue to recycle, setting industry-leading targets, using our lean operating system to manage the day-to-day work, and then delivering on our promises, building trust with our customers and our investors. This is how we've made our system safer, faster. It's how we delivered on our 2022 and 2023 EPS guidance. And it's how we can further strengthen our balance sheet while keeping bills affordable for our customers. I'm especially proud that we reduced non-fuel operating and maintenance costs by 5.5% in 2023. That's in addition to fully observing inflation and on top of the 3% we achieved in 2022. Looking forward, we see no shortage of opportunities to continue delivering better outcomes for customers at a lower cost all across the business. I'd note that not all of the 2023 reduction hit the bottom line, with the majority directly benefiting customers, including our self-insurance solution and substantial efficiencies in our vegetation management work. Our mid-teens by 2024 FFO to debt target is on track, and there is no change to our plan to reduce parent company debt by at least $2 billion by the end of 2026. We remain firmly committed to achieving solid investment grade ratings. In December, we were pleased to see S&P revised their rating outlook from stable to positive, indicating the potential for an upgrade in the next 12 months. And earlier this week, I'm delighted to say that Moody's upgraded our rating by one notch, also leaving us with a positive outlook. This puts us one notch away from investment grade, one step closer to our goal. We value the support we receive from our regulators, helping us strengthen our balance sheet while we execute our plan to affordably serve customers and investors. For example, on February 1st, the Commission issued a proposed decision authorizing interim rate relief in the amount of $516 million, while our wildfire and gas safety cost application is pending. The interim relief may be voted on as early as March 7th, and would provide for collections to start as soon as practical over a 12-month period. Moving to slide 11, as you can see here, and as expected, the largest discrete driver of fourth quarter and full-year results was the approval of our 2023 general rate case, which added $0.15. We also saw a benefit of $0.03, partly attributed to our non-fuel O&M savings, including better resource management and improved planning and execution. Please recall that our O&M savings are part of our simple, affordable model, which allows us to complete more work for the benefit of our customers while delivering affordability. That's exactly what you see here with $0.05 of redeployment. Our savings allowed us to stand up 10 additional model yards, designed to improve frontline productivity with more efficient processes, minimizing rework, and eliminating waste as we deliver for our customers. We also provided additional training resources for our co-workers and we accelerated inspections, calling forward work to protect 2024, and ensuring we're doing the highest priority work for our customers. We use every extra resource to better serve our customers and achieve our commitments to you, our investors. We weather the ups and downs to deliver consistent, predictable results. As Patti highlighted, we ended 2023 at the top of our EPS guidance range, although our core philosophy remains to redeploy excess earnings back into the system, benefiting customers while de-risking and extending premium growth on behalf of investors. On slide 12, we are extending our CapEx and rate-based growth projections another year to include 2028, showing a five-year annual rate-based growth of 9.5%. Our new five-year capital plan represents an increase of over $10 billion, or approximately 20% over the 2023 to 2027 plan. This also is over 45% higher than the previous five-year period from 2019 to 2023. The amounts shown on this slide reflect our base capital plan, including how much our rate-based is already approved by regulators. The vast majority, or 93%, of our rate-based for this year is already authorized, as is 90% of our 2026 forecast. In addition to our plan, there are substantial needs to do more. Specifically, we have at least an incremental $5 billion of CapEx opportunities, which we will seek to fold into our plan while still meeting our affordability commitments. These include capacity investments and transmission upgrades to support continued system-wide growth. As we work to drive affordability under our simple affordable model and ongoing deployment of lean, we will look for opportunities to add this important work. As you know, this capital investment fuels both earnings growth and improves our operating cash flow, as illustrated on slide 13, which we have updated and extended since we first showed it at last year's investor day. As shown, we're projecting substantial improvement in our operating cash flow in 2024, partly as a result of the final GRC decision. Operating cash flow grows from $5 billion in 2023 to $11 billion by 2028, providing resources to grow our capital investment for customers from $9.8 billion in 2023 to $14 billion in 2028, and substantially improving our cash flow before dividends. As Patti mentioned, our guidance includes no new equity in 2024. As we look forward, we have many good efficient financing choices, including close to $2.5 billion of annual retained earnings today and rising from there at our present low level of dividend payout. Half of our funding is provided from normal utility debt, substantial levels of prior cost recovery, favorable tax conditions, improvements in working capital, the sale of a minority interest in our non-nuclear generation assets, and potentially reintroducing an at-the-market or ATM equity program in 2025. While we are not giving the final mix of our 2025 financing plan today, rest assured that our plan only includes choices which are accretive to our guidance. In light of this, we are extending our core EPS growth rate of at least 9% through 2027 and 2028. Moving to slide 14, this is our simple affordable model and a breakdown of the 5.5% O&M savings last year. Patti shared details about our undergrounding achievements in 2023, and there are many more similar stories throughout the business. I’ll share just one more with you today. At our investor day, you heard about improvements we were making to the new customer connections process by leveraging our performance playbook. Now, here's how we ended the year. The team was able to save $24 million while decreasing average end-to-end lead time by 13%. That's a 50-day reduction. We also reduced engineering design time by 33%, a 37-day reduction. As a result, customer on-time delivery improved by 25 percentage points. I share this example to make an important point. This is not a cost-cutting program at PG&E. Rather, this is about good business decisions, which are sustainable for the long term, and it's about using the performance playbook, including the Lean operating system, to improve how we do our work every day. Our actions are improving the customer experience and making capital and safety investments affordable. I'll end here on slide 15 with regulatory catalysts on the horizon in 2024. As you can see, they are still plentiful and include resolution of our proposed PacGen sale, a proposed decision in Phase 2 of our GRC, implementing Senate Bill 410 and unlocking our potential to meet the new customer demand here in California, filing of our 10-year undergrounding plan, and bringing our $5 billion of incremental capital opportunities into the plan while still meeting our affordability goals. Finally, I'll comment on our cost of capital adjustment advice letter, which was approved by Commission staff in December, raising our allowed ROE from 10% to 10.7% and truing up our cost of debt. While this adjustment is already approved and in customer rates starting this month, in January, a joint intervener group filed a late request for review of staff's approval. While we recognize this creates some uncertainty for investors, we were pleased that the Commission staff upheld operation of the adjustment mechanism in December as intended. Intervenors offered no new fundamental arguments in their request for review, and we look forward to this issue being resolved expeditiously. In the meantime, as we have said consistently, our EPS growth guidance is not dependent on the outcome, and we value the opportunity to redeploy the revenue uplift for the benefit of customers while delivering consistent, predictable results for investors. There's a lot to look forward to in 2024 and beyond, including our 10% core EPS growth guidance and our at least 9% growth rate now extended through 2028. With that, I'll hand it back to Patti.
Thank you, Carolyn. Before we take your questions, let me introduce our new report card here on slide 16, against which you'll be able to track our record of differentiated performance. We're showing our results for 2022 and 2023, along with our goals for 2024 and beyond. We believe we have a differentiated plan and the right team in place to deliver on these objectives. As I said earlier, performance is power, and we have significant operational momentum with a healthy set of catalysts in front of us. The PG&E turnaround is on track. We trust you feel the momentum as we do. We look forward to seeing you at upcoming investor conferences, as well as our investor meeting scheduled for June 12th in New York. With that, Operator, please open the lines for questions.
Operator
Our first question comes from Shar Pourreza with Guggenheim Partners. Please go ahead.
Hey guys, good morning.
Morning.
Just Patti, on the PacGen process, I mean, have you received sort of any feedback after the last round of communications with the commission? Any sort of thoughts on hurdles and deliberation? And as you guys are sort of planning around the scenarios, does the delay potentially move your equity, especially as you return OpCo cap structure to authorized levels? Thanks.
Yes, thanks for the question, Shar. I'd say our communications with the Commission have been very constructive regarding PacGen. We know that PacGen is a good transaction for customers. California has very long-term clean energy ambitions, and this is a beautiful fleet of clean energy resources that need investment over the coming years. And to be able to share that with an investment partner is good for California's clean energy ambitions and good for customers. And so our extended time with the Commission on these topics have been good. That helps us truly make the case. And frankly, the Commission's had a lot on its plate, and so I can understand why they wanted a little more time. They know this is an important transaction. They want to give it a full look, and our conversations have been very constructive with them regarding that. I'll hand it over to Carolyn and let her discuss our financing plans, both with and without PacGen, because we know PacGen isn't the only thing. Carolyn referenced an important set of choices that we have. PacGen is one of our choices for financing, but I'll let Carolyn go ahead and take that.
Thanks, Shar, for the question. Yes, and if you don't mind, I covered a lot of this in the call, but I do recognize it's been a busy morning for many of you. So let me just cover a couple of points. First, we raised and extended our core EPS guidance today. It's 12% in 2023 and at least 10% in 2024, and at least 9% now through 2028. Our refreshed five-year plan includes improvement in our operating cash flows, rising from about $5 billion in 2023 to $11 billion in 2026. And that's providing the resources to grow our capital investment and further improve our cash flow. Three, key point here, our guidance includes no new equity in 2024 with or without PacGen. And then as we look forward beyond 2024, as we said on the call, we have many good financing choices. And they include, close to $2.5 billion of annual retained earnings today, which is rising at our present low level of dividend. We have half of our funding provided from normal utility debt. We talked about substantial levers of prior cost recovery, favorable tax conditions. We are constantly working on our working capital improvements. And of course, we have potentially reintroducing an at-the-market or ATM equity program in 2025. We're not giving you all the final mix of that 2025 financing plan today, but one thing that you can count on is that our plan will include choices which are accretive to our guidance.
Perfect. Perfect. Okay.
Well, if I just one thing on it, because I do know, and I just know I'm going to get lots of questions on the ATM. And so I just want to close that. I think it's, I just want to say very clearly to everyone that it's just simply too soon to size the potential ATM. As we've said on this call, we have a number of other good financing choices available to us. And we have other things that we need to consider, which include our growing lean capability and O&M savings. The pace at which we introduce the additional $5 billion of CapEx. And then our own advocacy and timely regulatory outcomes. And of course, the pace of our dividend growth. So just there's a lot there. And I just thought maybe because it's been a busy morning, I want to just restate all of that for you all.
Yes. And Shar, just to close out the subject, you asked a very fulsome question, so we gave you a fulsome answer. Just to close it out, we ride the roller coaster. This is what we do. There are ins and outs, ups and downs. We ride that so that we can deliver this consistent earnings growth profile that we've described and we've committed to. We intend and we plan and are very confident that we can stand by our EPS growth guidance through 2028, even with the range of equity assumptions.
Got it. And Carolyn, this is super helpful. And thank you. And just to make sure we confirm this, it sounds like you're, I don't want to say shifting, but some of your prior messaging, with the stock price kind of dictating your equity timing to now being a little bit more focused around a more systematic approach to raising equity through the trajectory like the rest of this industry is transitioning towards. Is that a fair statement?
Well, I think what's important is that we stand by our commitment to you that we will find the most efficient financing available to us. And at this point in time, as we look at our stock, it is not the most efficient financing.
Yes, great, thank you.
Hi, Steve.
Good morning. You chose the wrong data report with NVIDIA performing exceptionally well. But, anyway...
It's a long game, Steve. It's a long game. We know it's going to be all right.
Yes, absolutely. In the past, when you discussed the growth rate, you also mentioned total return. Now that the dividend has been reinstated, can you provide any reasons for not addressing that earlier and share your current thoughts on the dividend aspect?
Yes. Thank you, Steve, for that question. We recognize that our current dividend is low and that the growth rate of our dividend is a significant concern for many. I'm pleased you brought it up. Our goal is to maintain a competitive payout ratio and to demonstrate substantial progress over this five-year period. I'm happy to provide further insights into this five-year planning horizon. As we consider this, we believe the growth rate will be significant and markedly different from our peers, given our starting position. The speed at which we advance during these five years will depend on our unique financing strategies. In the short term, it's important to remember that we are focusing on maintaining a healthy balance sheet, ensuring affordable investments for customers, and achieving premium EPS growth. Over time, we will gradually integrate these elements, but our growth rate will clearly differ from that of our peers due to where we currently stand.
Okay, that makes sense. It's better to start from a position of choices that have been different in the past. Regarding the commission and packaging, we've experienced delays in several areas over time. Is this just the normal process, or is there something else affecting the PacGen approvals?
Yes. No, I think a couple of things just in terms of context. I do believe the adjudication of our rate case provides a lot of good visibility and discussion about cash flow, it's importance. So I do think we definitely have better alignment with the commission on subject for us, which is why we would be pursuing a PacGen transaction. I think they value the resources. And they want to make sure, on behalf of the customers of California that it's a good transaction for customers, we believe that it is a great transaction for customers it sets us up to have a partnership over time to invest in these clean energy resources. We see growing load growth in California. We see the need for new generation. This allows us to have a partner in that journey. And we know that, that will be the lowest cost of financing then for customers. And so we stand by the transaction. We know that additional time with the commission only allows us to better communicate and align with them on that.
Okay, great. I have one more question about the cash flow slide, which was very helpful. Regarding the deficits shown there each year, they seem relatively modest. Can a lot of that be covered by utility debt? I assume utility debt is not included there yet.
No. I think that's the way you're thinking. I think that's right the way you're thinking about it. I'll just remind you that there is an additional $5 billion of incremental CapEx that we're looking at financing as well. And we would, again, consider that ensure that we are financing that so that it's accretive to earnings.
Yes. Thank you, good morning. Just coming back to the cash flow slide. I was wondering if you could help fill in some of the drivers between 2024 and 2025. 2025, the dot looks to be around $10 billion in cash flow versus the $8 billion in 2024 in but you've got the wildfire recoveries coming down. So obviously, depreciation is a driver growth just struggling to connect the dots a little bit.
So the $5 billion to the $8 billion from 2023 to 2024 million is your question. What's driving that? Just making sure I'm...
Well really to 2025 because you got the wildfire recoveries coming down, but you've got the cash flow going up.
Yes. The increase in our revenues is primarily due to our General Rate Case from 2024, along with our 2% savings being compounded. Additionally, we anticipate a reduction in litigation related to our wildfire issues, which has been a factor for us. Furthermore, based on our outlook for commodity prices, we expect lower collateral postings as well. While there are many factors at play, the main contributor to the increase is our rate base recovery from the General Rate Case, which is the key aspect of the situation, although there are several other influencing factors.
Good morning. What would be the rate payer impact of a year delay to potential PacGen sale as you see it?
Just to clarify, are you asking about the savings from the PacGen sale and the benefits associated with it?
Yes. I mean you've articulated publicly or mine that there is rate benefits this transaction. So I'm just trying to get a sense of why you see a delay or a year?
Yes. We think this is a great transaction for customers, right? It provides customer affordability primarily through financing costs at PacGen as well as because it's improving our balance sheet, we expect to be able to up and we expect to lower financing costs for our customers G&A as well. But as Patti mentioned, we also see significant benefits for customers because these assets are so key to the clean energy goal. And having a partner that is bringing both the resources and the interest and expertise in supporting these future capital growth needs of this very important portfolio, we think that's where it's particularly going to benefit customers. So there are the two things I would point to.
Hey thanks so much for taking my question. So I apologize, it's been a little all over the place, hopefully not repeating another question, but just the positive outlook, BAA1 and then obviously, good to see the debt moved back to green here on the report card. Just what's your milestone? What's your understanding of the milestones and just kind of the timeline to get to investment grade now?
Thanks for the question, Nick. We have been having productive discussions with both Moody's and S&P. Our primary focus is on enhancing our credit quality, with a strong commitment to achieving an investment-grade rating. We are making steady progress on our credit metrics year after year, aiming for a mid-teens FFO to debt ratio in 2024. Our five-year plan indicates significant advancements in 2024 and 2025, accompanied by sustained high levels of cash generation. The rating agencies are evaluating more than just our credit metrics and cash flow; they are also considering our improvements in risk mitigation related to wildfires. Moody's is similarly focused on wildfire mitigation as well as governance and management, along with our credit metrics. I believe the most important indicators to assess our progress are the ratings agencies and their reports. We were pleased with the recent upgrade and the ongoing positive outlook from both Moody's and S&P. We will keep executing our plan, focusing on risk mitigation, operational and maintenance savings, and ensuring improvements in our credit metrics for the rating agencies.
Hey team, can you guys hear me okay?
We can hear you, Julien. Good morning.
Wonderful. So look, I just wanted to follow up on a couple of things that were said thus far. In terms of updates around this ATM, I know you said you're expecting a lot of questions, but just to frame it out really. In terms of the timeline here, I mean, A, you've got to know what happens with PacGen by the middle part of the year. But B, I suspect you're going to continue to evaluate asset sales, you said that would be something incremental to what PacGen would materialize that. And then by the end of the year, if there was nothing else that would materialize, then you would kind of go back to that sort of last resort ATM. I mean, given the success in cost cuts, etcetera, I mean, you could kind of interpret that as effectively saying, Look, there's a lot of other levers we'll probably pull in the interim and a successful outcome at least at this stage with this equity price would be not necessarily pursuing an ATM. Is that kind of a fair way to frame it?
It's really too soon to assess a potential ATM in 2025, but we have many good options to consider. We're particularly focused on our growing lean capability and the operational and maintenance savings, which we achieved at 3% in 2022 and 5.5% last year. We are excited about this success and believe it could play a significant role. We are also discussing the additional $5 billion in new capital expenditures, ensuring that it is affordable and can be financed through various options. The timing of this $5 billion in new CapEx depends on our plans for the ATM in 2025, as well as several ongoing regulatory outcomes that we are advocating for. Additionally, we expect to have more clarity on the timing of our dividend growth as we approach 2025. All these factors will ultimately influence the potential size of the ATM.
I believe last year was a significant indicator for all of us, demonstrating that we can implement undergrounding on a large scale and do so affordably for our customers. This will fundamentally improve the health and well-being of those living near power lines. That's our first key point. However, the general rate case has adjusted our planned mileage downwards. This year, we expect to carry out approximately 250 miles of undergrounding in accordance with the rate case. We will also be submitting our 10-year undergrounding plan as mandated by SB 884, which we hope to have approved by late 2025 or early 2026. This will outline a decade-long strategy for undergrounding as a crucial component of California's climate-resilient infrastructure. It's important to note that our undergrounding plan is not a significant gamble; it represents only 8% of our total line miles, but targets the highest risk areas. This ensures that customers do not have to choose between reliability and safety; they can have both affordably. We will effectively present the benefits of such investments in our filing, along with the long-term net present value advantages to customers. Additionally, our capital plan is comprehensive, including a range of investments that do not solely depend on the undergrounding initiative, yet we continue to endorse that critical infrastructure as a response to the evolving climate challenges we face in California.
Yes. Thank you, good morning. Just coming back to the cash flow slide. I was wondering if you could help fill in some of the drivers between 2024 and 2025. 2025, the dot looks to be around $10 billion in cash flow versus the $8 billion in 2024 in but you've got the wildfire recoveries coming down. So obviously, depreciation is a driver growth just struggling to connect the dots a little bit.
So the $5 billion to the $8 billion from 2023 to 2024 million is your question. What's driving that? Just making sure I'm...
Hey good morning. Thanks so much. Great to see you're extending the EPS growth rate here. I was just wondering kind of what gave you the confidence now to provide those EPS growth assumptions through 28 given that there's another cost of capital proceeding and another GRC in the midst of that planning period?
We have a great plan, and it's anchored in our simple, affordable model. We have ample capital demand. And this is the thing that I want to just acknowledge for our customers who are feeling the catch-up in our bills right now. We know that we can deliver this capital infrastructure, which they have been demanding and requesting and asking for us to deliver in an affordable way. So as we look forward, we have a conservative plan. We ride that roller coaster so we can deliver a consistent outcome for investors and better service every single year for customers. And frankly, we look forward to a time in the not-too-distant horizon where we're going to be lowering bills for customers as we do that. The simple affordable model will work here in California. We are in the early days. But as we look forward, we see the capital demand matched by our cost savings, load growth and efficient financing, which allows for affordable bills for customers. That's a formula that can work for a long time forward. It gives us a lot of confidence as we give forecasted EPS growth guidance in the next 5-year plan.
And David, I'll just remind you, we always plan conservatively. And so that's what gives us also lots of confidence.
Okay. And then maybe on load growth, it's the data center backdrop seems to have changed quite a bit maybe since you've given that 1% to 3% load growth figure. And it sounds like you might address that in upcoming Analyst Day. I was just wondering if that's reflective of what you've seen in your service territory in terms of that data center demand, is that accelerating ramping up from what your prior expectations had been?
Yes. Well, I can share that just in 2023, we had a 3x increase in data center applications versus the prior four years. So as we look at the 5-year forward load growth forecast, the back end of that forecast will reflect then the additional data center demand. And look, I think we all can agree that the only thing that's happening with data centers is they need more of them. And so part of the deal here is we need to make ourselves available and accessible and show that we can in fact serve that load here in California, which is what we're doing. And we'll look forward to sharing more about that in June. Thank you, Mandeep. Well, thank you, everyone, for joining us today. I know it was a busy one, and we appreciate your time and attention. We look forward to staying in touch with you. I just want to give a final remark and thank the entire PG&E team for delivering an outstanding 2023 for customers. They deliver for our hometowns. We're serving our planet, and we're leading with love at PG&E, and I couldn't be more proud to stand alongside the men and women of PG&E to do just that. So feel really great about our turnaround. We know that, that turnaround is on track. Thanks to all those great people here at the company, and we look forward to seeing all of you in the coming months and definitely in June, on June 12 in New York. Thanks so much. Have a safe day.
Operator
This concludes today's call. You may now disconnect.